Built for Tier 1 main contractors who demand zero defects, on-time handovers, and warranty-backed workmanship. We don't cut corners — we build them.
What do you need?
MF & concealed grid systems, mineral fibre tiles, metal pan ceilings, rafts and bulkheads. BREEAM-compliant specifications with full acoustic testing documentation for every install.
Metal stud & board partitions, demountable systems, IPS panels, shaft walls and plasterboard linings. Fire-rated assemblies up to 120 minutes with third-party certification.
Passive fire protection including fire-rated boarding, fire stopping and cavity barriers. All work completed by FIRAS-accredited operatives with full photographic evidence packs.
Acoustic ceilings, sound-rated partitions, isolation systems and specialist absorbers. We design to BB93 and HTM standards with pre- and post-completion testing to prove compliance.
We anchored our standards against industry averages — then exceeded them. Here's the data.
| Metric | Avg. UK Contractor | Apex Build Co. |
|---|---|---|
| Defect Rate at Handover | 4.2% | 0.3% |
| Average Completion Time | +12 days over | 2 days early |
| Warranty Length | 2 years | 12 years |
| CSCS Qualified Operatives | 78% | 100% |
| Snagging Items per 1,000 sqm | 14 | 1.2 |
| Response Time (Urgent) | 48 hours | 4 hours |
Site visit within 48 hours. Full measured survey, risk assessment, and buildability review before any quote leaves our office.
Detailed method statement, programme, and material schedule. Every fixing, every bracket, every fire seal — documented before we mobilise.
CSCS-carded operatives only. Daily progress photography, weekly programme updates, foreman on-site at all times. Zero ambiguity.
Pre-handover snagging walk, full O&M documentation, as-built drawings, and our industry-leading 12-year warranty. We stand behind every screw.
Join 247+ projects delivered for London's most demanding main contractors. We don't pitch — we prove.
Get Your Quote →